Description of Job | Total Inch Meter Erected |
---|---|
5 Tons / Hour Capacity Oil fired Boiler erection for M/s. Thermax Ltd. at Manali Petro Products Ltd. site Manali, Chennai including steam lines erection. - 2 Units | 3500 IM |
5 Tons / Hour Capacity Oil fired Boilers - 2 nos. erection including steam lines for M/s. Thermax Ltd. at Tamilnadu Petro products Ltd. Manali. | 2500 IM |
10 Tons / Hour Capacity - 3 Units Oil fired boiler erection for M/s. Thermax Ltd. at Hindustan Photofilms Mfg. Co. Ltd. at Ooty site including steam lines. |
4000 IM |
5 Tons / Hour Capacity - 1 Unit Oil fired Boiler erection for M/s. Arun Processors Ltd. Erode including Design, supply, Fabrication & erection of Steam Lines. |
2500 IM |
10 Ton / Hour Water tube boiler erection and fabrication and erection of steam pipe lines, feed water pipeline, blow down line, etc., for M/s. Thermax Babcock & Wilcox Ltd. Pune at M/s. Indian Rare Earths Ltd.under Kerala IBR. | 4000 IM |
5 Ton / Hour x 2 Waste heat recovery boiler including piping erected at SPIC, Tuticorin plant for their DCDA Conversion Project. | 1500 IM |
80 Tons of Steam Piping fabrication & erection at Vizag Steel Plant for M/s. Blue Star Ltd. Dia 200 NB to 1200 NB under Andhra Pradesh IBR | 8000 IM |
Power cycle Piping for M/s.Thermax Babcock & Wilcox Ltd. at SPIC Tuticorin for 70 Ton / Hour Co-generation unit | 4000 IM |
Design, supply, fabrication & erection of steam lines for process purpose at Crystal Knit Process Pvt. Ltd. Erode including supply of valves, fittings, etc., | 2000 IM |
Steam line for Decanting system at North Madras Thermal Power Project.12000 IM consisting of CS Pipes ranging from 15 NB to 200 NB. | 12000IM |
Design, supply, fabrication, erection, testing of steam line for M/s. Mangal Dyeing & Printing Mills Ltd. | 5000 IM |
Carbon steel and Alloy steel pipelines for M/s. Bombay Saburban Electricity Supply at North Madras Thermal Power Project, Chennai - Sizes ranging from 25 NB to 250 NB in Carbon steel about 12000 IM and Alloy steel about 1000 IM. | 12000 IM
1000 IM |
Design, supply, fabrication, erection, testing of steam line for M/s. Together Leasing, Coimbatore. | 3000 IM |
Supply, Fabrication, erection, testing of SS Pipings inside process house for Welspun India Ltd, TerryTowel Expansion Plant at Morai, Vapi. | 10000 IM |
Prefabrication of Header Pipes, - Riser Tubes, Down comer Pipes,etc. For Rain Calcining Ltd. under Inspection by M/s. Fichtner Consultants Ltd. | 80 TONS |
CS Fabricated Mitre Bends - IBR supplied to The Fertilizers and Chemicals Travancore Ltd. Cochin under Inspection by Projects & Development India Ltd. | |
Erection and commissioning of 2 nos. Exhaust Gas Boilers & accessories at SRF, Manali on behalf of M/s. Thermax Engg Construction Co. Ltd, Pune. | 1300IM(IBR) 548IM(Non-IBR) |
Have a project with us? Feel free. Get in Touch